—Factory & quality control

From block to sealed container.

Production is a sequence of checkpoints, not a single final inspection. Each stage has acceptance criteria and a record you can review before the vessel sails.

01Factory & quality control

Production sequence

  1. 01

    Block selection

    Blocks are inspected for colour consistency, fissures and soundness before they enter the yard.

  2. 02

    Sawing

    Diamond wire and gang saws cut to slab thickness; slabs are numbered and tracked against the order.

  3. 03

    Fabrication

    Cut-to-size, profiling, edge work and drilling are completed from the approved shop drawing.

  4. 04

    Surface finishing

    Polished, honed, flamed, brushed, sandblasted, bush-hammered or split-face, applied to the approved sample.

  5. 05

    Inspection

    Three gates: slab selection, finished dimensions and surface, then packing and loading.

  6. 06

    Export packing

    Fumigated crates, foam interleaving and reinforced corners, loaded to a written container plan.

Split-face / Cladding
Flamed / Paving
Sawn / Kerbs

02Factory & quality control

Three inspection gates

01

Gate 1 — Material

Colour and vein consistency against the approved sample; fissures, cracks and contamination rejected.

02

Gate 2 — Dimension & surface

Length, width, thickness, diagonal, edge profile and finish checked piece by piece on cut-to-size work.

03

Gate 3 — Packing

Crate condition, foam protection, weights, labelling and container loading verified before sealing.

03Factory & quality control

Packing standard

CratesFumigated timber, ISPM 15 marked
ProtectionFoam interleaving; reinforced corners on slabs
BundlesSteel or plastic strapping with edge protection
ContainerWritten loading plan, photographed before sealing
MarkingOrder number, crate number, dimensions and weight

04Factory & quality control

Documents issued

  • Shop drawings approved before production
  • Inspection records per gate
  • Density, absorption and strength test reports on request
  • Packing list with crate weights and dimensions
  • Certificate of conformity against the approved specification

Ask for a sample inspection pack with your quotation — redacted for other clients, of course.

Want to see the inspection record?